Project Overview
ProCut contributed to the seismic and safety preparation of the new Christchurch Stadium, delivering precision concrete cutting and drilling across key structural areas.
The project required accurate set-out, consistent cut quality and coordination with other trades working through major structural packages on a busy construction site.
Scope of Work
- Core drilling to support major structural connections
- Cutting channels for seismic strengthening works
- Preparation of stadium steps for anti-slip strip installation
Outcome
ProCut delivered the required cutting and drilling works to support the stadium’s strengthening and safety preparation, helping the wider construction team progress critical structural and access works.